2017 Periodic Nourishment - Avalon
The Townsends Inlet to Cape May Inlet Coastal Storm Risk Management Project includes the construction of a dune and berm system in Avalon and Stone Harbor, N.J. with a 3-year nourishment cycle.

Download Image: Full Size (0.16 MB)
Tags:
Photo by: USACE |  VIRIN: 200611-A-EO314-103.JPG