Results:
Tag: Reedy Point Bridge
Clear
  • Army Corps to reduce Reedy Point Bridge traffic to one lane

    PHILADELPHIA (March 26, 2015) –- Traffic on the Reedy Point Bridge will be reduced to one lane beginning the morning of April 1 to enable the replacement of a fence over the bridge, the U.S. Army Corps of Engineers’ Philadelphia District announced today. The Army Corps expects the one-lane restriction to remain in effect until approximately May 1. During that period traffic will be controlled by portable traffic signals at each end of the lane that remains open.
  • Traffic on Reedy Point Bridge to be reduced to one lane

    PHILADELPHIA, Pa. (October 1, 2014) –- Traffic on the Reedy Point Bridge will be reduced to one lane
  • Work to resume on Reedy Point Bridge Feb. 25

    Inspection and construction activity will resume on the Reedy Point Bridge Monday, Feb. 25, necessitating the closure of one lane of traffic. Traffic flow will be regulated during that time with temporary traffic signals. Workers will close one lane of traffic by 7 a.m. on Feb. 25 and begin preparing the bridge for sandblasting and painting. Painting will resume once the weather has turned consistently warmer. Work is expected to continue throughout the Spring.
  • Reedy Point Bridge open for the winter

    Both lanes of the Reedy Point Bridge, a cantilever truss bridge that carries Delaware Route 9 over the Chesapeake & Delaware Canal, are now open to traffic. Except for a day or two of testing, in which case one lane will be closed, both lanes will remain open until the spring.