Dredged Hole 35 Restoration
The Dredged Hole 35 Restoration Project involves filling the existing dredged hole with approximately 118,000 cubic yards of dredged material from NJIWW maintenance dredging to restore approximately 4 acres of submerged aquatic vegetation and fisheries habitat.

Download Image: Full Size (0.11 MB)
Tags:
Photo by: USACE |  VIRIN: 130620-A-EO314-700.JPG