Chester, Delaware and Montgomery Counties
The project area for the development of the decision support tool and project alternatives is divided into 4 sub-basins based on similar characteristics. Analysis can be conducted on watersheds as small as 1.0 square miles.

Download Image: Full Size (0.38 MB)
Tags:
Photo by: USACE |  VIRIN: 130909-A-EO314-555.JPG