Townsends Inlet to Cape May Inlet
The Townsends Inlet to Cape May Inlet project involved the construction of 2.2 miles of seawall along the Townsends Inlet frontage of Avalon and the Hereford Inlet frontage of North Wildwood.

Download Image: Full Size (2.47 MB)
Tags:
Photo by: USACE |  VIRIN: 130816-A-EO314-101.JPG