Cutterhead Pipeline Dredge Works in Great Egg Harbor Inlet
Initial construction of the the New Jersey Shore Protection, Great Egg Harbor and Peck Beach, (Ocean City), NJ project was completed in 1992. The project undergoes periodic nourishment on a 3-year cycle.

Download Image: Full Size (2.57 MB)
Photo by: USACE |  VIRIN: 200527-A-EO314-122.JPG