2019 Periodic Nourishment
The Townsends Inlet to Cape May Inlet Coastal Storm Risk Management Project includes the construction of a dune and berm system in Avalon and Stone Harbor with a 3-year nourishment cycle (pending available funding).

Download Image: Full Size (0.14 MB)
Tags:
Photo by: USACE |  VIRIN: 200611-A-EO314-105.JPG