St. Georges Bridge Repairs
Bill Nash, a project engineer working on the St. Georges Bridge repair project stands in front of contractors who are working to replace the bridge decking on the structure. The approximately 18-month project includes demolishing and replacing the bridge decking, median barrier, as well as replaces the bridge approaches and roadways.

Download Image: Full Size (5.32 MB)
Photo by: Patrick Bloodgood |  VIRIN: 230808-A-OI229-1007.JPG