Results:
Tag: C&D Canal
Clear
  • Work to resume on Reedy Point Bridge Feb. 25

    Inspection and construction activity will resume on the Reedy Point Bridge Monday, Feb. 25, necessitating the closure of one lane of traffic. Traffic flow will be regulated during that time with temporary traffic signals. Workers will close one lane of traffic by 7 a.m. on Feb. 25 and begin preparing the bridge for sandblasting and painting. Painting will resume once the weather has turned consistently warmer. Work is expected to continue throughout the Spring.
  • Reedy Point Bridge open for the winter

    Both lanes of the Reedy Point Bridge, a cantilever truss bridge that carries Delaware Route 9 over the Chesapeake & Delaware Canal, are now open to traffic. Except for a day or two of testing, in which case one lane will be closed, both lanes will remain open until the spring.
  • USGS identifies problems with Pearce Creek disposal facility

    A study commissioned by the U.S. Army Corps of Engineers (USACE) has identified problems with the groundwater in the vicinity of the Pearce Creek Confined Disposal Facility, a site the Corps seeks to utilize for maintenance dredge sediment from the Chesapeake and Delaware Canal southern approach channels.