The applicant proposes to address deficiencies of the existing US 322 roadway. The US 322 Improvement Project is being undertaken by the Pennsylvania Department of Transportation in cooperation with the Federal Highway Administration. Currently, the US 322 lane configuration is divided into two typical cross sections: a western section and an eastern section. The western section consists primarily of two lanes with uncontrolled access to both lanes from intersecting roads and driveways. The eastern section, beginning east of the intersection with Cherry Tree Road in Upper Chichester Township, consists of a four lane divided highway and provides semi‐controlled access to one direction of the highway from properties adjacent to the roadway.