The U.S. Army Corps of Engineers has announced the release of a draft report for the Eastwick Flood Risk Management Study. The draft report outlines a ‘Tentatively Selected Plan,’ which includes an approximately 1400-foot levee along the left bank of Cobbs Creek within the Eastwick Regional Park and Clearview Landfill. The levee plan is designed to reduce the risk of flood damages to homes, property, and public infrastructure.