Links

Redirecting...
Results:
Tag: Dock Reconstruction
Clear
  • NAP-2024-00623-46

    Expiration date: 11/21/2024

    The stated purpose is to rehabilitate and upgrade the existing dock/bulkhead infrastructure which is necessary for continued operation of the working commercial waterfront facility and shellfishery. The applicant has additionally stated that the purpose of the bulkhead re-construction is to allow for repairs of a failed timber bulkhead for both stabilization of eroding banks and minimization of flooding of the adjacent parking areas used for loading and un-loading of vessels moored at the facility.